They saved the original door frames and doors to reuse
These pipes control the heating in the floors and ceiling, they have valves that adjust to control the amount of heat. The pipes needed to be relocated because of the position of the new wall.
More high tech carpenter tools, these are old boards that have been tied together with wire to form a vise to hold the door frame in place while the concrete dries.
A sample of different heat reflecting windows for the kitchen
The poor mason, every time he builds a wall someone comes along and chisels a hole in it. These are water pipes for the guest toilet sink.
As you exit the elevator you will see the view of the city
Ron and Alberto
Guest reception toilet door frame
Part of the foyer wall has been removed. We wanted to remove it entirely but there were pipes running through part of the wall.
More channels chiseled into the walls for water and electrical pipes